ROBIN RIGG WIND FARM
The PVL cutting torch was used during this project to fully automatically cut
off a wind turbine pole up to 25 meters deep underwater.
This project was conducted in the Irish Sea in 2022.
ROBIN RIGG WIND FARM
ROBIN RIGG WINDFARM
The PVL burner was used during this project to fully automatically burn
off a wind turbine pole up to 25 meters deep underwater.
This project was conducted in the Irish Sea.
CLIENT: Herema
PERIOD: 2022
The PVL Cutting Torch was used during this project to fully automatically cut off a wind turbine pole up to 25 meters deep underwater.
This project was conducted in the Irish Sea in 2022.