NEW SEA LOCK TERNEUZEN

The PVL torch has been used during the Sea Lock Project Terneuzen to cut away

the piles and sheet piling on the concrete floor of the lock at a depth of 20 meters underwater.

NEW SEA LOCK TERNEUZEN

The PVL torch has been used during the Sea Lock Project Terneuzen to cut away the piles and sheet piling on the concrete floor of the lock at a depth of 20 meters underwater.

NEW SEA LOCK TERNEUZEN

The PVL torch has been used during the Sea Lock Project Terneuzen to cut away the piles and sheet piling on the concrete floor of the lock at a depth of 20 meters underwater.