NEW SEA LOCK IJMUIDEN
The PVL torch was used during the new Sea lock IJmuiden to cut the piles
and sheet piling and outrigger frames, on the concrete floor of the new
sea lock at a depth of 24 meters underwater.
NEW SEA LOCK IJMUIDEN
The PVL burner was used during this project to cut the piles and sheet piling
and outrigger frames, on the concrete floor of the new sea lock at a depth of
24 meters underwater.